top of page
istockphoto-517340891-612x612.jpg

JME

JME ADVANCED INSPECTION SYSTEMS. PROUDLY SUPPORTING THE NDT INDUSTRY FOR OVER 35 YEARS.

Generic-CR2-Logo.png
CR2

Section Title

CR2 Bend Radius
DXB:1
DXB-Logo

Digital X-Ray Buggy

JME would like to present their newest product, the DXB:1 Digital X-Ray Buggy; designed to produce high-quality panoramic digital radiographs of circumferential welds in applications such as new pipelines. As a versatile and configurable system, it can also be utilised for use in various non-pipeline applications, such as the inspection of tank walls or other ferrous metal structures.

DXB:1
DXB:1 On Pipe

Example stitched radiograph captured using DXB:1 and CR2 robot combo

DXB-Weld-Image

This digital system is a replacement for traditional film radiography; so no more chemical processing, dark rooms, or flaws associated with conventional radiography. The DXB includes a high-definition digital panel for instant verification of image quality and system settings. Images are digitally stored, preventing the need for film storage and enabling a permanent record to be saved within the control tablet. These can be backed up via USB or using a Network connection, allowing the images to be sent to an off-site Radiographer seconds from acquisition.

​

JME’s DXB system also communicates and integrates with our entire CR2 Pipeline Crawler Range. This allows 2-way communication between the Pipeline Crawler and DXB, giving configuration of key crawler parameters from the DXB control tablet. This integration also allows commencement of inspection with the push of a single button. The DXB operator is able to control, adjust and view the status of the CR2 crawler at all times during an inspection task.

​

With a rapid magnetic deployment system, the DXB:1 can be positioned by a single person in less than a minute. The system is attached using permanent magnets, meaning in the event of a loss of power the unit will remain firmly attached to the pipe. This quick and efficient deployment dramatically increases productivity on-site. There is no need for welding bands to be deployed and relocated between each inspection which again greatly improves efficiency on-site.

DXB-DS-Images-1.png

Get in Touch

UNIT 8, 2 APOLLO STREET

WARRIEWOOD, NSW 2102

(02) 9979 8777

  • Youtube
  • Facebook
  • LinkedIn

Thanks for submitting!

  • Facebook
  • LinkedIn
bottom of page